Termidor 80 WG Termiticide Insecticide archived 2024 04 2026 03 22

Practice 8 Termidor 80 WG Termiticide Insecticide archived 2024 04 2026 03 22 exam questions with instant feedback and cited explanations.

Practice ExamsChemicals › Termidor 80 WG Termiticide Insecticide archived 2024 04 2026 03 22
Start practice — 8 questions →

Sample questions

When treating foundations deeper than 4 feet outdoors, what is the required application rate?

Answer: For foundations deeper than 4 feet, the rate is 2 gallons per 10 linear feet per foot of depth.

🔗 Source

If the soil will not accept the labeled volumes, what alternative application method is permitted?

Answer: The notes state that if soil will not accept labeled volumes, twice the concentration (0.25%) may be applied in half the volume of finished dilution.

🔗 Source

To achieve a 0.125% finished strength, how much Termidor 80 WG should be mixed with 67 gallons of water?

Answer: The mixing instructions state that 4 units of product in 67 gallons of water results in a 0.125% finished strength.

🔗 Source

According to the label restrictions, what is the minimum finished dilution concentration allowed for horizontal and vertical treatments?

Answer: The restrictions state DO NOT apply at a LOWER dosage and/or concentration than 0.06%, 0.09%, or 0.125%.

🔗 Source

Which of the following pests is NOT listed as a target pest for Termidor 80 WG?

Answer: The label lists subterranean, arboreal, drywood, and dampwood termites, carpenter ants, beetles, and borers, but does not mention bed bugs.

🔗 Source

When applying Termidor 80 WG to horizontal treated zones beneath a concrete slab on ground, what nozzle pressure should be used?

Answer: The label specifies using a coarse application nozzle with a nozzle pressure of 25 PSI or less for horizontal treated zones.

🔗 Source

Where can Termidor 80 WG be applied according to the 'location' descriptions for concrete slab horizontal treated zones?

Answer: The label lists the location for Concrete Slab on Ground or in Basements - Horizontal Treated Zones as 'Both'.

🔗 Source

What is a specific restriction regarding the treatment of footings?

Answer: The label explicitly states: 'DO NOT treat a structure below the bottom of the footing.'

🔗 Source

← All practice exams